A renovation deadline is not a suggestion. The lease starts whether the space is ready or not. Horizon Contractors Inc. plans commercial renovations and tenant improvements in St. Catharines and across Niagara around your possession window, reopening date, and the work the space needs.

One coordinated scope can cover demolition, reconfiguration, partitions, ceilings, flooring, millwork, washrooms, mechanical and electrical coordination, painting, and final finishes. Work can be sequenced around an occupied facility or a vacant unit.

Commercial interior renovation in progress with a protected work zone, ceiling grid, and trades preparing a finished tenant space
Plan the handover first. Then set the inspections, trade sequence, material orders, and phase boundaries that lead to it.
Define the scope Sequence the work Prepare handover
Phased construction planning
Dust, noise, and work-zone controls
Trade coordination under one contract
Inspection-ready handover planning

Scope, coordinated

What a Commercial Renovation Actually Includes

A clear scope connects the visible finishes to the work behind the walls and above the ceiling. Open any item to see where coordination matters.

Demolition and strip-out

Remove selectively. Keep what can stay.

The scope can include selective demolition, debris removal, recycling, and planning for hazardous-material protocols where required. Existing services and surfaces are reviewed before removal begins.

Space reconfiguration

Make the layout fit the work.

New partitions, corridor alignment, room sizes, doors, and glazing positions are coordinated with circulation, accessibility, and the intended use of each space.

Ceilings and services

Coordinate the space above the grid.

Acoustic tile, drywall ceilings, grid replacement, lighting layouts, and above-ceiling services need to work together. Early coordination helps reduce late changes during installation.

Flooring and finishes

Choose finishes for the use and traffic.

Possible finish scopes include carpet tile, resilient flooring, tile, polished concrete, wall finishes, and paint systems. Substrate preparation and transitions are part of the conversation.

Millwork and fixtures

Fit the details to the way people use the space.

Reception desks, service counters, cabinetry, casework, and washroom fixtures can be included in the coordinated scope, with dimensions and service connections checked before installation.

Washrooms and mechanical

Plan the upgrades that affect daily operation.

Work may include fixture replacement, plumbing relocations, ventilation adjustments, electrical distribution upgrades, lighting replacement, and coordination of sprinkler changes with qualified trades.

Keep operations in view

Renovating an Occupied Building Without Shutting It Down

An occupied renovation needs a boundary people can understand and crews can maintain. The work plan accounts for staff, patients, customers, or production on the other side of it.

01

Set phase boundaries

Divide the work into areas so the untouched portion can continue to function. Confirm access, egress, and shared routes before each phase starts.

02

Contain the work zone

Plan temporary partitions, dust barriers, floor and finish protection, secured work areas, and negative-air equipment where the project calls for it.

03

Schedule disruption carefully

Move louder work around client-facing hours where practical. Evenings, weekends, or shutdown windows may suit specific tasks.

04

Keep people informed

Coordinate temporary power, lighting, washrooms, and wayfinding with your operations or facilities contact. Review upcoming work together each week.

Protected corridor beside an occupied commercial workspace, with temporary dust partitions separating renovation activity from daily access
Make the boundary clear. Access routes, barriers, and daily work areas should be agreed before crews arrive.

For property owners

Turning Over a Vacant Unit for Its Next Tenant

A vacant unit can need more than a fresh coat of paint. Set the turnover scope against the incoming lease date, the unit's condition, and any work that needs inspection.

A practical turnover scope

  • Strip-out and removal of items that won't carry into the next tenancy.
  • Ceiling, lighting, flooring, and paint refresh based on the unit's condition.
  • Washroom updates and storefront or entry improvements where needed.
  • Trade sequencing coordinated across multiple units in the same property.
  • Completed-work documentation for the incoming tenant and future maintenance.

Work back from possession

Use the lease start or possession date to identify the available work window and key approvals.

Coordinate neighbouring units

Where scopes overlap, align mobilization and building access to reduce repeated disruption.

Keep a clear work record

Record completed work and relevant handover details for the property file.

Schedule from the finish date

Schedules Built Backwards From Your Deadline

A generic duration doesn't tell you whether a unit will be ready for your lease commencement or reopening date. The sequence has to account for the real decision points.

01

Set the handover date

Confirm the target date, possession window, and any operational limits that shape the work period.

02

Allow for inspections

Identify required permits, review points, and inspection windows early so sign-off is part of the plan.

03

Sequence finishes and rough-ins

Coordinate the order of services, partitions, ceilings, flooring, millwork, and final finishes.

04

Protect the critical path

Flag long-lead materials early, build in realistic contingency, and communicate changes that affect the schedule.

The plan depends on the scope, approvals, site conditions, and material availability. We make those dependencies visible before they become a handover problem.

Examples of renovation scope

These illustrative scope snapshots show the kinds of changes a renovation plan can cover. They are examples, not a record of completed client projects.

Explore the project portfolio

Start with the constraints

Give Us the Space and the Deadline

Share the property address, target completion date, and any known occupancy limits. The next step is a site review, a written scope with phasing options, and budget direction before you commit.

Commercial renovations and tenant improvements in St. Catharines, the Niagara Region, and Southern Ontario.